Skip to content
LOS Analyzer

Antenna tower · 2026

MI09427-S

Farmington Hills, MI · near St Mary Mercy Hospital (7.1 mi)

Determination of no hazardDetermined - No Hazard135 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Corrects structure height to 135' AGL per new tower height verification."

Filing details

Case number (ASN)
2026-AGL-6481-OE
Structure
MI09427-S
Type
Tower / antenna
Category
Antenna tower
Height above ground
135 ft
Height above sea level
1,017 ft
Site elevation
882 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 27, 2026
Determined
May 13, 2026
Determination expires
—

Who filed it

Sponsor
SBA Towers
Representative
Clinton Papenfuss

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by SBA Towers →

Location

Coordinates
42.494519, -83.398772
Degrees / minutes / seconds
42°29'40.3"N 83°23'55.6"W
County
Oakland

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.