Skip to content
LOS Analyzer

Antenna tower · 2026

Mount Carmel Tower - WYNG

Mount Carmel, IL · near Mount Carmel Muni (14.7 mi)

Marking and lightingRevision450 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"K-LOVE respectfully requests Deviation from Red Obstruction Light Standards by elimination of steady-burning side marker L-810 tower lights. This is for bird safety and reduced operating costs."

Filing details

Case number (ASN)
2026-AGL-6880-OE
Structure
Mount Carmel Tower - WYNG
Type
Tower / antenna
Category
Antenna tower
Height above ground
450 ft
Height above sea level
875 ft
Site elevation
425 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Red lights

Timeline

Filed
May 4, 2026
Determined
May 5, 2026
Determination expires
—

Who filed it

Sponsor
K-LOVE, Inc.
Representative
David Velasquez

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
38.399167, -87.788861
Degrees / minutes / seconds
38°23'57.0"N 87°47'19.9"W
County
Wabash

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.