Skip to content
LOS Analyzer

Construction equipment · 2026

United Airlines Hanger 1

Cleveland, OH · near Cleveland-Hopkins Intl (0.9 mi)

Returned to proponentDetermined - No Hazard80 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"These points represent the equipment staging and bound box for the mobile crane required for the loading and unloading of roofing material for the Hanger 1 roofing project. Refer to drawing United Airlines Crane Placement Hangar 1 Final for the limits of the work area."

Filing details

Case number (ASN)
2026-AGL-8622-NRA
Structure
United Airlines Hanger 1
Type
Construction / other
Category
Construction equipment
Height above ground
80 ft
Height above sea level
870 ft
Site elevation
790 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 12, 2026
Determined
September 9, 2026
Determination expires
March 9, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Cleveland Hopkins International Airport
Representative
Monica Drake, MPA, CM

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Cleveland Hopkins International Airport →

Location

Coordinates
41.401581, -81.842019
Degrees / minutes / seconds
41°24'05.7"N 81°50'31.3"W
County
Cuyahoga

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Cleveland-Hopkins Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.