Crane · 2026
Big Al
South Portland, ME · near Portland Intl Jetport (1.3 mi)
What this outcome means
An interim result issued while the aeronautical study continues. It is not the final determination.
The proposal, in the filer's words
"Operate our barge mounted crane for construction projects at our facility."
Filing details
- Case number (ASN)
- 2026-ANE-1318-OE
- Structure
- Big Al
- Type
- Crane / barge
- Category
- Crane
- Height above ground
- 119 ft
- Height above sea level
- 119 ft
- Site elevation
- 0 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- April 29, 2026
- Determined
- —
- Determination expires
- —
Who filed it
- Sponsor
- Bancroft Contracting Corp
- Representative
- Bancroft Contracting Corp
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 43.640000, -70.283611
- Degrees / minutes / seconds
- 43°38'24.0"N 70°17'01.0"W
- County
- Cumberland
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Portland Intl Jetport →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.