Skip to content
LOS Analyzer

Antenna tower · 2026

Williston Public Safety Facility No C-Band

Williston, VT · near Patrick Leahy Burlington Intl (3.0 mi)

Marking and lightingFinal90 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Update paint/marking to silver per the town's requirements and red light at the top"

Filing details

Case number (ASN)
2026-ANE-1556-OE
Structure
Williston Public Safety Facility No C-Band
Type
Pole / mono
Category
Antenna tower
Height above ground
90 ft
Height above sea level
604 ft
Site elevation
514 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 12, 2026
Determined
June 17, 2026
Determination expires
—

Who filed it

Sponsor
State OF Vermont, Building AND General Services
Representative
Comsearch

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
44.436278, -73.118222
Degrees / minutes / seconds
44°26'10.6"N 73°07'05.6"W
County
Chittenden

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Patrick Leahy Burlington Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.