Skip to content
LOS Analyzer

Power line · 2026

Span N12-5 to N12-6

Fall River, MA · near Myricks (9.1 mi)

Marking and lightingRevision313 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"This is a marking change request. The subject structure does not require marking because 2025-ANE-3507-OE is a taller catenary wire within 200 feet that will be marked."

Filing details

Case number (ASN)
2026-ANE-355-OE
Structure
Span N12-5 to N12-6
Type
Catenary
Category
Power line
Height above ground
313 ft
Height above sea level
311 ft
Site elevation
-2 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 10, 2026
Determined
February 12, 2026
Determination expires
—

Who filed it

Sponsor
National GRID (AU)
Representative
Federal Airways & Airspace (TW)

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
41.737958, -71.141053
Degrees / minutes / seconds
41°44'16.6"N 71°08'27.8"W
County
Bristol

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.