Skip to content
LOS Analyzer

Construction equipment · 2026

Taxiway G Reconstruction

Moses Lake, WA · near Grant County Intl (1.4 mi)

Returned to proponentDetermined - No Hazard30 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This is for the preconstruction phase of the Taxiway G reconstruction project AIP#3-53-0039-050-2025. Constructs a temporary taxilane for tenants on Taxiway H so that Taxiway H can be closed for approximately 6 months. See sheet G2.5 of the attached exhibit. The work area shown on G2.2 has been previously submitted under case # 2026-ANM-1302-NRA."

Filing details

Case number (ASN)
2026-ANM-1303-NRA
Structure
Taxiway G Reconstruction
Type
Construction / vehicle
Category
Construction equipment
Height above ground
30 ft
Height above sea level
1,192 ft
Site elevation
1,162 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 30, 2026
Determined
August 13, 2026
Determination expires
February 13, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
PORT OF Moses LAKE
Representative
Century WEST Engineering

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
47.190522, -119.306969
Degrees / minutes / seconds
47°11'25.9"N 119°18'25.1"W
County
Grant

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.