Skip to content
LOS Analyzer

Building · 2026

5-Unit T-Hangar

Sunnyside, WA · near Sunnyside Muni (0.2 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The proposal will construct a new five unit T hangar for AI and BI type aircraft including a new prefabricated steel building and concrete foundation"

Filing details

Case number (ASN)
2026-ANM-1446-NRA
Structure
5-Unit T-Hangar
Type
Building / hangar
Category
Building
Height above ground
15 ft
Height above sea level
776 ft
Site elevation
761 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
May 11, 2026
Determined
September 9, 2026
Determination expires
March 9, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
CITY OF Sunnyside
Representative
HLA Engineering and Land Surveying, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
46.325864, -119.967158
Degrees / minutes / seconds
46°19'33.1"N 119°58'01.8"W
County
Yakima

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.