Skip to content
LOS Analyzer

Building · 2026

BZ3 Bend Hangar

BEND, OR · near Bend Muni (0.1 mi)

Returned to proponentDetermined - No Hazard23 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"construct 9 000 s.f. hangar"

Filing details

Case number (ASN)
2026-ANM-1623-NRA
Structure
BZ3 Bend Hangar
Type
Building / hangar
Category
Building
Height above ground
23 ft
Height above sea level
3,447 ft
Site elevation
3,424 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
May 28, 2026
Determined
September 2, 2026
Determination expires
March 2, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
BZ3 Bend
Representative
LB Engineering

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
44.095142, -121.201806
Degrees / minutes / seconds
44°05'42.5"N 121°12'06.5"W
County
Deschutes

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Bend Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.