Other · 2026
Work Area 8
Riverton, WY · near Central Wyoming Rgnl (0.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"PFC Application 04. Rehabilitate Runway 1-19. Central Wyoming Regional Airport is seeking to collect and use a Passenger Facility Charge (PFC) at Central Wyoming Regional Airport (RIW). Reference previous Case No. 2026-ANM-884-NRA."
Filing details
- Case number (ASN)
- 2026-ANM-1979-NRA
- Structure
- Work Area 8
- Type
- Other
- Category
- Other
- Height above ground
- 20 ft
- Height above sea level
- 5,483 ft
- Site elevation
- 5,463 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- June 22, 2026
- Determined
- August 31, 2026
- Determination expires
- February 29, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- City of Riverton, Wyoming
- Representative
- Klay Nelson
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 43.061644, -108.461875
- Degrees / minutes / seconds
- 43°03'41.9"N 108°27'42.8"W
- County
- Fremont
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Central Wyoming Rgnl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.