Building · 2026
B2S Hangar
Laurel, MT · near Laurel Muni (0.4 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"Construction of a new 4 200 sq ft hangar at 2615 Cory at the Laurel Airport 6S8. \nBuilding will be 60' wide facing Cory and 70' deep. The hanger door will be on the 60' wide side of the building and face South West. Building height above finish floor will be 21' 11\. Sidewalls will be clad in metal siding white roof will be clad in metal roofing galvalume color.""
Filing details
- Case number (ASN)
- 2026-ANM-228-NRA
- Structure
- B2S Hangar
- Type
- Building / hangar
- Category
- Building
- Height above ground
- 22 ft
- Height above sea level
- 3,477 ft
- Site elevation
- 3,455 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- January 23, 2026
- Determined
- March 10, 2026
- Determination expires
- September 10, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Braydon Sinclair
- Representative
- Braydon Sinclair
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 45.705564, -108.753336
- Degrees / minutes / seconds
- 45°42'20.0"N 108°45'12.0"W
- County
- Yellowstone
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.