Antenna tower · 2026
OR-5044 | North Highway
Jordan Valley, OR · near Rome State (30.1 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"new cell site adding freq and cband julie heffernan 561 2796348"
Filing details
- Case number (ASN)
- 2026-ANM-3415-OE
- Structure
- OR-5044 | North Highway
- Type
- Tower / antenna
- Category
- Antenna tower
- Height above ground
- 205 ft
- Height above sea level
- 4,322 ft
- Site elevation
- 4,117 ft
- Notice of
- Existing
- Duration
- Permanent
- Marking & lighting
- Dual-red and medium intensity
Timeline
- Filed
- May 11, 2026
- Determined
- September 11, 2026
- Determination expires
- —
Who filed it
- Sponsor
- VB BTS V LLC
- Representative
- Vertical Bridge
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 42.883550, -117.463661
- Degrees / minutes / seconds
- 42°53'00.8"N 117°27'49.2"W
- County
- Malheur
- Open in a map
- Google MapsOpenStreetMap
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.