Skip to content
LOS Analyzer

Construction equipment · 2026

Temporary Overhead WaterTank

Boise, ID · near Boise Air Trml/Gowen Fld (1.3 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This is a temporary overhead water tank that will be used during construction of the BOI Runway 10L-28R Reconstruction Project. The tank is 42 feet long 8 feet in diameter and the highest point will be 24' off the ground. It will be taken down by December 1 2026."

Filing details

Case number (ASN)
2026-ANM-401-NRA
Structure
Temporary Overhead WaterTank
Type
Construction / other
Category
Construction equipment
Height above ground
25 ft
Height above sea level
2,839 ft
Site elevation
2,814 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 11, 2026
Determined
April 2, 2026
Determination expires
October 2, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Boise Airport
Representative
BOI Airport

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
43.568917, -116.246994
Degrees / minutes / seconds
43°34'08.1"N 116°14'49.2"W
County
Ada

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Boise Air Trml/Gowen Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.