Skip to content
LOS Analyzer

Antenna tower · 2026

Kemmerer Compressor Station Tower

Kemmerer, WY · near Kemmerer Muni (11.7 mi)

Determination of no hazardDetermined - No Hazard120 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Construct a new 100ft self-supporting tower for a communication link to Williams Gas Control"

Filing details

Case number (ASN)
2026-ANM-434-OE
Structure
Kemmerer Compressor Station Tower
Type
Tower / antenna
Category
Antenna tower
Height above ground
120 ft
Height above sea level
6,721 ft
Site elevation
6,601 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
January 23, 2026
Determined
March 4, 2026
Determination expires
September 4, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Northwest Pipeline CORP.
Representative
Bryant Reimann

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
41.823392, -110.784208
Degrees / minutes / seconds
41°49'24.2"N 110°47'03.1"W
County
Lincoln

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.