Crane · 2026
Hyundai and Subaru of Fort Myers
Fort Myers, FL · near Page Fld (0.9 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"Mobile crane needed to replace HVAC package system rooftop units on top of Hyundai of Fort Myers and Subaru of Fort Myers. Both crane setting points will have a 55 foot radius horizontal reach from parking lot to roof. Crane will be in place less than 4 hours total to accomplish both lifts. Boom will not exceed 95 feet"
Filing details
- Case number (ASN)
- 2026-ASO-10074-OE
- Structure
- Hyundai and Subaru of Fort Myers
- Type
- Crane / mobile
- Category
- Crane
- Height above ground
- 95 ft
- Height above sea level
- 113 ft
- Site elevation
- 18 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- Red lights and flags
Timeline
- Filed
- May 18, 2026
- Determined
- June 9, 2026
- Determination expires
- December 9, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- B&I Contractors, Inc
- Representative
- Chanel Allard
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 26.596272, -81.854006
- Degrees / minutes / seconds
- 26°35'46.6"N 81°51'14.4"W
- County
- Lee
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Page Fld →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.