Skip to content
LOS Analyzer

Power line · 2026

STR_585

Canon, GA · near Franklin-Hart (0.7 mi)

Preliminary findingsPending34 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Installation of 5 new distribution poles for 12.4kV line. This is an extension of an existing line to service a new subdivision being built. Bucket trucks being used for installation that will not extend past the structure height. Canon Dist. Project_N0514_12.4kV"

Filing details

Case number (ASN)
2026-ASO-11029-OE
Structure
STR_585
Type
Pole / utility
Category
Power line
Height above ground
34 ft
Height above sea level
941 ft
Site elevation
907 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 2, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
Georgia Power Co
Representative
Caitlin Russell

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Georgia Power Co →

Location

Coordinates
34.344789, -83.120619
Degrees / minutes / seconds
34°20'41.2"N 83°07'14.2"W
County
Franklin

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.