Skip to content
LOS Analyzer

Airport development · 2026

EDE- Runway Rehab - CSPP

Town of Edenton, NC · near Northeastern Rgnl (0.6 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The Runway 1-19 Pavement Rehabilitation project at EDE includes rehabilitation of Runway 1-19 including milling and overlay of the existing pavement. All joints and cracks remaining after the milling will be sealed. Other Work elements include erosion control installation minor grading marking seeding and mulching. Runway 1-19 and various taxiways will be closed during runway pavement rehabilitation project. Contract time is 45 days only. Project start date will depend on funding availability and grant establishment. See attached Figure for limits of Runway pavement rehabilitation and Contractor’s Staging Area. Temporary Equipment height is 25'."

Filing details

Case number (ASN)
2026-ASO-1110-NRA
Structure
EDE- Runway Rehab - CSPP
Type
Other
Category
Airport development
Height above ground
25 ft
Height above sea level
42 ft
Site elevation
17 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 17, 2026
Determined
July 9, 2026
Determination expires
January 9, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Town of Edenton
Representative
Talbert, Bright & Ellington LLC

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
36.020211, -76.570089
Degrees / minutes / seconds
36°01'12.8"N 76°34'12.3"W
County
Chowan

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.