Skip to content
LOS Analyzer

Rig · 2026

Well SAS-3A

Stuart, FL · near Witham Fld (0.8 mi)

Determination of no hazardDetermined - No Hazard50 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Proposed project consists of the construction of replacement irrigation wells and a monitoring well for the Sailfish Sands Golf Course irrigation system. Construction activities will require temporary use of approximately 50 foot tall drilling rigs and associated construction equipment. The maximum height associated with the proposed work is the temporary drilling rig. Upon completion of well installation all drilling equipment will be removed from the site and no permanent vertical obstruction is proposed. As schedule will be provided once the project is publicly bid and awarded by Martin County in Q3/Q4 2026."

Filing details

Case number (ASN)
2026-ASO-13083-OE
Structure
Well SAS-3A
Type
Rig / drilling
Category
Rig
Height above ground
50 ft
Height above sea level
55 ft
Site elevation
5 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
June 29, 2026
Determined
July 13, 2026
Determination expires
January 13, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Martin County
Representative
Kimley-Horn

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Martin County →

Location

Coordinates
27.180058, -80.208006
Degrees / minutes / seconds
27°10'48.2"N 80°12'28.8"W
County
Martin

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Witham Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.