Building · 2026
Curry Honda Car Dealership
Chamblee, GA · near Dekalb-Peachtree (1.5 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"ALTERATION OF AN EXISTING CAR DEALERSHIP SHOWROOM AND ACCESSORY OFFICE SPACES AT 5525 PEACHTREE BLVD CHAMBLEE GA 30341. DEMOLITION SCOPE INCLUDES DEMOLITION OF EXISTING SHOWROOM OFFICES AND HARDSCAPE. NEW WORK SCOPE INCLUDES A NEW 2 STORY STRUCTURE WITH A NEW INTERIOR SHOWROOM OFFICES RESTROOMS AND BACK OF HOUSE SPACE. NEW EXTERIOR WORK INCLUDES NEW PAVING PLANTERS BIKE PARKING AND LIGHTING. NO CHANGE OF OCCUPANCY OR USE ON THE SITE."
Filing details
- Case number (ASN)
- 2026-ASO-13204-OE
- Structure
- Curry Honda Car Dealership
- Type
- Building / commercial
- Category
- Building
- Height above ground
- 27 ft
- Height above sea level
- 1,005 ft
- Site elevation
- 978 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- July 1, 2026
- Determined
- July 23, 2026
- Determination expires
- January 23, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- LITHIA
- Representative
- Mark Fernandez
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.898137, -84.301383
- Degrees / minutes / seconds
- 33°53'53.3"N 84°18'05.0"W
- County
- DeKalb
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dekalb-Peachtree →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.