Antenna tower · 2026
Lake City East Main
Lake City, SC · near Lake City Muni Cj Evans Fld (1.9 mi)
What this outcome means
No determination is recorded on this case in the FAA's published archive. Cases still under study show no determination until the aeronautical study closes.
The proposal, in the filer's words
"Proposed 250' Self Support Tower with 5' lighting rod"
Filing details
- Case number (ASN)
- 2026-ASO-13288-OE
- Structure
- Lake City East Main
- Type
- Tower
- Category
- Antenna tower
- Height above ground
- 255 ft
- Height above sea level
- 326 ft
- Site elevation
- 71 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- July 7, 2026
- Determined
- —
- Determination expires
- —
Who filed it
- Sponsor
- Envision Towers SC, LLC
- Representative
- Envision Towers SC, LLC
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.861558, -79.736247
- Degrees / minutes / seconds
- 33°51'41.6"N 79°44'10.5"W
- County
- Florence
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.