Skip to content
LOS Analyzer

Power line · 2026

Catenary: ME-5 - M-6

Pikeville, KY · near Letcher County Airport (17.7 mi)

Marking and lightingFinal302 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Request for lighting deviation please see attachments These structures have previously been filed under 2025-ASO-24492 to 24503-OE."

Filing details

Case number (ASN)
2026-ASO-13464-OE
Structure
Catenary: ME-5 - M-6
Type
Catenary
Category
Power line
Height above ground
302 ft
Height above sea level
1,416 ft
Site elevation
1,114 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
July 8, 2026
Determined
July 28, 2026
Determination expires
—

Who filed it

Sponsor
American Electric Power (VP)
Representative
Federal Airways & Airspace (TW)

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by American Electric Power (VP) →

Location

Coordinates
37.304669, -82.597683
Degrees / minutes / seconds
37°18'16.8"N 82°35'51.7"W
County
Pike

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.