Skip to content
LOS Analyzer

Crane · 2026

Kane Lot 17

Raleigh, NC · near Joint Force Hq Helipad (4.7 mi)

Determination of no hazardDetermined - No Hazard293 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Temporary Tower Crane to service the construction of the new residential tower. Had previously filed per 2023-ASO-26491-OE along with an extension ... so refiling per FAA direction. Tower crane is currently in place and once dismantled in Q1 2027 we'll file the dismantlement paperwork."

Filing details

Case number (ASN)
2026-ASO-15325-OE
Structure
Kane Lot 17
Type
Crane
Category
Crane
Height above ground
293 ft
Height above sea level
625 ft
Site elevation
332 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
Red lights and flags

Timeline

Filed
August 5, 2026
Determined
August 28, 2026
Determination expires
February 28, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Balfour Beatty Construction
Representative
Balfour Beatty Construction

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
35.835586, -78.637883
Degrees / minutes / seconds
35°50'08.1"N 78°38'16.4"W
County
Wake

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.