Skip to content
LOS Analyzer

Bridge · 2026

I-75 49th Street Overpass

Ocala, FL · near Ocala Intl-Jim Taylor Fld (5.0 mi)

Determination of no hazardDetermined - No Hazard55 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"FDOT is constructing new overpass at 49th street that will be constructed to an elevation of approximately 138ft AMSL when completed."

Filing details

Case number (ASN)
2026-ASO-1720-OE
Structure
I-75 49th Street Overpass
Type
Bridge
Category
Bridge
Height above ground
55 ft
Height above sea level
138 ft
Site elevation
83 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
January 26, 2026
Determined
January 29, 2026
Determination expires
—

Who filed it

Sponsor
The Lane Construction Corporation
Representative
Ike Laber

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
29.237886, -82.190222
Degrees / minutes / seconds
29°14'16.4"N 82°11'24.8"W
County
Marion

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Ocala Intl-Jim Taylor Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.