Skip to content
LOS Analyzer

Crane · 2026

Crane

ATLANTA, GA · near Hartsfield/Jackson Atlanta Intl (1.1 mi)

Returned to proponentDetermined - No Hazard140 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Project is to remove existing roof top HVAC unit and place a temporary unit on the roof. Additional mobilizations to set materials on the roof ahead of equipment removal and placement as well. Then the unit would be removed at the end of cooling season.\n\nThis application is a resubmittal for the following determined cases: 2025-ASO-135 through 139-NRA. The reason for the resubmittal is due to the project's new start date and its duration exceeding the expiration date of the original submittals (08/10/2026)."

Filing details

Case number (ASN)
2026-ASO-2089-NRA
Structure
Crane
Type
Crane / mobile
Category
Crane
Height above ground
140 ft
Height above sea level
1,169 ft
Site elevation
1,029 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 19, 2026
Determined
April 28, 2026
Determination expires
October 28, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Atlanta - DOA
Representative
Andrick Raschke

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Atlanta - DOA →

Location

Coordinates
33.640408, -84.447000
Degrees / minutes / seconds
33°38'25.5"N 84°26'49.2"W
County
Clayton

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Hartsfield/Jackson Atlanta Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.