Antenna tower · 2026
HWY 25 GA (682883)
Hephzibah, GA · near Augusta Rgnl At Bush Fld (9.2 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"Increase height of existing Self Support Lattice Tower to 263ft. and add frequencies. Emissions from this site will adhere to the parameters set by collaboration between the FAA and telecommunications companies and reflected in the FAA 5G C-Band compatibility evaluation process. Keep current M&L. Questions Susan Davis 5015163647 susan.davis@verizonwireless.com"
Filing details
- Case number (ASN)
- 2026-ASO-2659-OE
- Structure
- HWY 25 GA (682883)
- Type
- Tower
- Category
- Antenna tower
- Height above ground
- 263 ft
- Height above sea level
- 559 ft
- Site elevation
- 296 ft
- Notice of
- Existing
- Duration
- Permanent
- Marking & lighting
- Dual-red and medium intensity
Timeline
- Filed
- February 6, 2026
- Determined
- May 11, 2026
- Determination expires
- November 11, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- * Cellco Partnership
- Representative
- Network Regulatory - C
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.264864, -82.061769
- Degrees / minutes / seconds
- 33°15'53.5"N 82°03'42.4"W
- County
- Richmond
- Open in a map
- Google MapsOpenStreetMap
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.