Skip to content
LOS Analyzer

Construction equipment · 2026

Batch Plant

CHARLOTTE, NC · near Charlotte/Douglas Intl (1.5 mi)

Returned to proponentDetermined - No Hazard60 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"A batch plant will remain as submitted via prior studies 2024-ASO-5346-NRA 5347-NRA 5348-NRA and 5349-NRA. Refer to the enclosed exhibit for the location."

Filing details

Case number (ASN)
2026-ASO-3686-NRA
Structure
Batch Plant
Type
Construction / other
Category
Construction equipment
Height above ground
60 ft
Height above sea level
754 ft
Site elevation
694 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 5, 2026
Determined
June 1, 2026
Determination expires
December 1, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Charlotte Douglas International Airport
Representative
RS&H, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Charlotte Douglas International Airport →

Location

Coordinates
35.233683, -80.959011
Degrees / minutes / seconds
35°14'01.3"N 80°57'32.4"W
County
Mecklenburg

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Charlotte/Douglas Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.