Skip to content
LOS Analyzer

Construction equipment · 2026

Taxiway Reconstruction (Phase 2) Equipment

Quitman, GA · near Quitman Brooks County (0.5 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Taxiway reconstruction phase of grading project at Quitman-Brooks. All other phases will require runway closure. This phase intends to allow the runway to remain operational during construction. Equipment will be flagged. Point 2 out of 4."

Filing details

Case number (ASN)
2026-ASO-3936-NRA
Structure
Taxiway Reconstruction (Phase 2) Equipment
Type
Construction / other
Category
Construction equipment
Height above ground
15 ft
Height above sea level
204 ft
Site elevation
189 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 11, 2026
Determined
July 27, 2026
Determination expires
January 27, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Quitman-Brooks County Airport Authority
Representative
Goodwyn Mills Cawood

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Quitman-Brooks County Airport Authority →

Location

Coordinates
30.805400, -83.580186
Degrees / minutes / seconds
30°48'19.4"N 83°34'48.7"W
County
Brooks

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.