Skip to content
LOS Analyzer

Building · 2026

Building - Concourse C RTU Installation

Atlanta, GA · near Hartsfield/Jackson Atlanta Intl (0.3 mi)

Returned to proponentDetermined - No Hazard45 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The scope of work for this existing building alteration entails the use of mobile crane(s) for lifting of air handling unit to the roof level of Concourse C. A separate crane application will be submitted to support the installation of the air handling unit."

Filing details

Case number (ASN)
2026-ASO-413-NRA
Structure
Building - Concourse C RTU Installation
Type
Building
Category
Building
Height above ground
45 ft
Height above sea level
1,052 ft
Site elevation
1,007 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
January 19, 2026
Determined
April 15, 2026
Determination expires
October 15, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Atlanta - DOA
Representative
Andrick Raschke

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Atlanta - DOA →

Location

Coordinates
33.638469, -84.432556
Degrees / minutes / seconds
33°38'18.5"N 84°25'57.2"W
County
Clayton

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Hartsfield/Jackson Atlanta Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.