Crane · 2026
PNS Titan Element II Hangar 4
pensacola, FL · near Pensacola Intl (0.8 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"Design Build Construction of Hangar 4. Project consist of a new Hangar facility for Engineering this will be a single story hangar. The crane will be used for drill deep foundation piles. The points marked on the map roughly represent the corners of the project boundary. The crane will operate within the project boundary. The crane will only be operated in the daytime and the boom will be lowered at the end of each day. Dates of operation will range from Late June until Early August."
Filing details
- Case number (ASN)
- 2026-ASO-4519-NRA
- Structure
- PNS Titan Element II Hangar 4
- Type
- Crane / mobile
- Category
- Crane
- Height above ground
- 84 ft
- Height above sea level
- 192 ft
- Site elevation
- 108 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- June 8, 2026
- Determined
- August 18, 2026
- Determination expires
- February 17, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- CITY OF Pensacola
- Representative
- Whiddon Macon
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 30.482121, -87.194166
- Degrees / minutes / seconds
- 30°28'55.6"N 87°11'39.0"W
- County
- Escambia
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Pensacola Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.