Skip to content
LOS Analyzer

Antenna tower · 2026

WQSB RADIO Tower (Sardis City)

Sardis City, AL · near Albertville Rgnl/Thomas J Brumlik Fld (13.0 mi)

Marking and lightingRevision968 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"The requested change is to bring to the current lighting circular 70/7460-1M Obstruction Marking and Lighting a HI-dual system - Chapters 4 9(HI- Dual) &15."

Filing details

Case number (ASN)
2026-ASO-9712-OE
Structure
WQSB RADIO Tower (Sardis City)
Type
Tower / antenna
Category
Antenna tower
Height above ground
968 ft
Height above sea level
2,005 ft
Site elevation
1,037 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Dual-red and high intensity white

Timeline

Filed
May 11, 2026
Determined
May 22, 2026
Determination expires
—

Who filed it

Sponsor
SAND Mountain Broadcasting Service
Representative
Kevin Bethke

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
34.158583, -86.045750
Degrees / minutes / seconds
34°09'30.9"N 86°02'44.7"W
County
Etowah

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.