Skip to content
LOS Analyzer

Building · 2026

SMT DC Houston III

Hockley, TX · near Dry Creek (13.4 mi)

Determination of no hazardDetermined - No Hazard30 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Data Center"

Filing details

Case number (ASN)
2026-ASW-10263-OE
Structure
SMT DC Houston III
Type
Building / commercial
Category
Building
Height above ground
30 ft
Height above sea level
277 ft
Site elevation
247 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 23, 2026
Determined
June 29, 2026
Determination expires
December 29, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
SMT Energy LLC
Representative
SMT Energy

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
30.022462, -95.904576
Degrees / minutes / seconds
30°01'20.9"N 95°54'16.5"W
County
Harris

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.