Skip to content
LOS Analyzer

Construction equipment · 2026

26103 Geronimo Concrete Batch Plant

Lawton, OK · near Lawton-Fort Sill Rgnl (4.2 mi)

Determination of no hazardDetermined - No Hazard120 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Propose to setup a concrete batch plant for the construction of the HEB Turnpike - Project HEB-MC-65D"

Filing details

Case number (ASN)
2026-ASW-11188-OE
Structure
26103 Geronimo Concrete Batch Plant
Type
Construction / other
Category
Construction equipment
Height above ground
120 ft
Height above sea level
1,221 ft
Site elevation
1,101 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
July 13, 2026
Determined
August 12, 2026
Determination expires
February 12, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Duit Construction Co., Inc.
Representative
Duit Construction Co., Inc.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
34.506486, -98.413976
Degrees / minutes / seconds
34°30'23.3"N 98°24'50.3"W
County
Comanche

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.