Construction equipment · 2026
AWOS Installation
Leesville, LA · near Leesville (0.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"The Automated Weather Observation System project is the procurement and installation of a new AWOS III P/T at the Leesville Municipal Airport (L39) in Leesville La. The project requires AWOS III P/T procurement and installation complete electrical service site preparation concrete pad and a monitoring system installed in terminal building. Neither short nor long term effects are anticipated to ground nor airport movement on and around the airfield with this project. Access to the site will be from exterior road for installation and future maintenance"
Filing details
- Case number (ASN)
- 2026-ASW-1138-NRA
- Structure
- AWOS Installation
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 33 ft
- Height above sea level
- 326 ft
- Site elevation
- 293 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- March 9, 2026
- Determined
- May 18, 2026
- Determination expires
- November 18, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- City of Leesville
- Representative
- Infrastructure Consulting & Engineering LLC
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 31.171100, -93.344132
- Degrees / minutes / seconds
- 31°10'16.0"N 93°20'38.9"W
- County
- Vernon
- Open in a map
- Google MapsOpenStreetMap
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.