Skip to content
LOS Analyzer

Building · 2026

4050 Regent Blvd Irving TX BLDG #1 of 5

Dallas, TX · near Dallas-Fort Worth Intl (2.6 mi)

Determination of no hazardDetermined - No Hazard46 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"This is for BLDG #1. Demolition of office buildings/surrounding concrete pavement and the construction of five (5) single-story industrial buildings totaling approximately 927 100 SF and associated parking spaces."

Filing details

Case number (ASN)
2026-ASW-1205-OE
Structure
4050 Regent Blvd Irving TX BLDG #1 of 5
Type
Building
Category
Building
Height above ground
46 ft
Height above sea level
573 ft
Site elevation
527 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
January 20, 2026
Determined
January 27, 2026
Determination expires
July 27, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Foundry Commercial Acquisitions, LLC
Representative
David Perry

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
32.921081, -97.002061
Degrees / minutes / seconds
32°55'15.9"N 97°00'07.4"W
County
Dallas

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Dallas-Fort Worth Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.