Construction equipment · 2026
Pt6
Portales, NM · near Portales Muni (0.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"The airport is proposing a project to remove the existing AWOS system and construct a new AWOS South of Runway 8-26 outside of all safety areas. This airspace review request is for PHASE 2 construction. During PHASE 2 Runway 8-26 Taxiway B B1 B2 B3 and B4 will be closed for a short duration Runway 1-19 Taxiway A A1 A2 A3 A4 and the apron will be open. Low profile barricades Closure X markings on both ends of the runway and disabling of lights will occur during this PHASE 2."
Filing details
- Case number (ASN)
- 2026-ASW-1255-NRA
- Structure
- Pt6
- Type
- Construction / other
- Category
- Construction equipment
- Height above ground
- 20 ft
- Height above sea level
- 4,083 ft
- Site elevation
- 4,063 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- March 17, 2026
- Determined
- June 3, 2026
- Determination expires
- December 3, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- PRZ Portales Municipal Airport
- Representative
- Molzen Corbin and Associates
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 34.145311, -103.406903
- Degrees / minutes / seconds
- 34°08'43.1"N 103°24'24.9"W
- County
- Roosevelt
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.