Construction equipment · 2026
B25-0482 Runway 18L-36R Rehab Phase II-B
DFW Airport, TX · near Dallas-Fort Worth Intl (0.9 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"B25-0482 Runway 18L-36R Rehabilitation Phase II-B Work\nThe site will be approximately 119 acres located inside the Air Operations Area (AOA) East of Runway 18R-36L. The site will be the Phase II-B work area in the Runway 18L-36R Rehabilitation project. The work areas impacted by this project include the Central and Northern portion of Runway 18L/36R portions of Taxiway F1 Y Z WH WG & WF. The purpose to obtain approval for the temporary construction equipment(s) associated with the Runway 18L-36R Rehabilitation project within the Airport Operations Area (AOA). The construction equipment(s) will have a maximum operating height not to exceed 35 feet AGL.\n• Within the defined project limits temporary haul roads will be constructed construction equipment and material stockpiles will be used and stored.\n• All vehicles and equipment traveling along haul roads will be limited to a maximum height of 15 feet AGL. All access routes haul roads and construction limits will be coordinated with DFW Airport Operations prior to mobilization.\n• Operating construction equipment (e.g. excavators loaders concrete trucks boom lifts) may reach up to 35 feet AGL during active use. When not in use equipment will be secured at ground level (≤15 feet AGL) within the enclosed work area.\n• Material stockpiles will be located within a defined and enclosed work zone inside the AOA. Stockpile heights will vary by material type with the maximum anticipated height not to exceed 6 feet AGL. Stockpiles will remain in place throughout the construction period and will be monitored and maintained regularly.\n• Parked equipment and stockpile locations will be coordinated with DFW Airport Operations.\nApproval for use of construction equipment up to 35’ in height within footprint of construction area. No changes to the ALP. Reference to 2026-ASW-1282-NRA."
Filing details
- Case number (ASN)
- 2026-ASW-1283-NRA
- Structure
- B25-0482 Runway 18L-36R Rehab Phase II-B
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 35 ft
- Height above sea level
- 626 ft
- Site elevation
- 591 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- March 19, 2026
- Determined
- May 4, 2026
- Determination expires
- November 4, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DFW International Airport
- Representative
- DFW International Airport
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 32.902842, -97.052225
- Degrees / minutes / seconds
- 32°54'10.2"N 97°03'08.0"W
- County
- Tarrant
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.