Crane · 2026

Rayburn RES II

Sherman, TX · near Sherman Muni (3.6 mi)

Determination of no hazardDetermined - No Hazard190 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"This proposal is for PSCs crane at site to be utilized for construction. PSC plans on utilizing a lattice boom crane to erect new equipment to be installed at the Rayburn RES II construction site next to the existing Rayburn RES I unit. This crane will start by assisting civil crews at ground level then later erect the equipment at site including the qty. 10 SGT 800 power units. These units are approximately 150 ft long 50 ft wide average 45 ft in height with the west side stack at 101 ft in height. These units are planned to be erected in December and the stack at 101ft to be erected late December 2026 to mid January 2027. Currently working with Rayburn electric and our site General contractor to determine who's responsible for requesting permitting on the permanent structures to be installed."

Filing details

Case number (ASN)
2026-ASW-14351-OE
Structure
Rayburn RES II
Type
Crane / mobile
Category
Crane
Height above ground
190 ft
Height above sea level
918 ft
Site elevation
728 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
August 31, 2026
Determined
September 9, 2026
Determination expires
March 9, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Primoris Services Corporation
Representative
Primoris Services Corporation

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
33.579536, -96.617553
Degrees / minutes / seconds
33°34'46.3"N 96°37'03.2"W
County
Grayson

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.