Skip to content
LOS Analyzer

Construction equipment · 2026

Construction Equipment

Malvern, AR · near Malvern Muni (0.3 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"For FY26 Malvern Municipal Airport intends to extend the partial parallel taxiway to the end of Runway 4-22. This project will be constructed in two phases with Runway 4-22 remaining open during Phase I and closed during Phase II. The height of the equipment will not exceed 20'. Phase I is anticipated to last 210 calendar days and the four points included in this study fully encompass the Phase I work area."

Filing details

Case number (ASN)
2026-ASW-1479-NRA
Structure
Construction Equipment
Type
Construction / vehicle
Category
Construction equipment
Height above ground
20 ft
Height above sea level
560 ft
Site elevation
540 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 30, 2026
Determined
June 26, 2026
Determination expires
December 26, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Malvern Municipal Airport
Representative
McClelland Consulting Engineers, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
34.330411, -92.764775
Degrees / minutes / seconds
34°19'49.5"N 92°45'53.2"W
County
Hot Spring

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.