Construction equipment · 2026
CR6
HOUSTON, TX · near George Bush Intcntl/Houston (0.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"***PLEASE STUDY IN 1A ACCURACY CODE ONLY. SURVEY CERTIFICATION IS ATTACHED. CEILING IS 255 FT AMSL***\r\n\r\nConstruction Crane Ceiling Height for the BS04 Construction Project\r\n\r\nProject description: \r\nThis project consist of installing a new Baggage Handling Building for the BHS system for Terminal B. The crane will be used to drill the deep foundations and install the new structural steel for the building. \r\n\r\nHeight of 160 ft AGL is for the installation of the deep foundations and erection of structural steel."
Filing details
- Case number (ASN)
- 2026-ASW-1952-NRA
- Structure
- CR6
- Type
- Construction / other
- Category
- Construction equipment
- Height above ground
- 255 ft
- Height above sea level
- 350 ft
- Site elevation
- 95 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- April 24, 2026
- Determined
- June 2, 2026
- Determination expires
- December 2, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Houston Airport System
- Representative
- Juan Pedracova
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 29.985611, -95.344061
- Degrees / minutes / seconds
- 29°59'08.2"N 95°20'38.6"W
- County
- Harris
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near George Bush Intcntl/Houston →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.