Antenna tower · 2026
36282
Houston, TX · near William P Hobby (9.8 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"The purpose of P1069-3 Rebuild/Reconudctor Hyde Park-Downtown project is to reconductor/rebuild the circuit 32A-1. The project scope is to rebuild approximately 1.28 miles of 69kV Ckt 32A-1 from Hyde Park to Downtown Substation to prepare for 138kV conversion."
Filing details
- Case number (ASN)
- 2026-ASW-2270-OE
- Structure
- 36282
- Type
- Pole / mono
- Category
- Antenna tower
- Height above ground
- 101 ft
- Height above sea level
- 152 ft
- Site elevation
- 51 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- February 4, 2026
- Determined
- February 9, 2026
- Determination expires
- August 9, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Centerpoint Energy
- Representative
- Verdantas
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 29.752638, -95.383615
- Degrees / minutes / seconds
- 29°45'09.5"N 95°23'01.0"W
- County
- Harris
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near William P Hobby →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.