Skip to content
LOS Analyzer

Construction equipment · 2026

General Construction Equipment 1

Bentonville, AR · near Bentonville Muni/Louise M Thaden Fld (0.3 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This is a temporary airspacing study for general construction equipment associated with Phases 1 and 2 of the West Turf Apron project at Bentonville Municipal Airport. Runway 18-36 will remain open during both phases. The points included in this study are located at the extents of the anticipated construction site and equipment will not exceed 15-ft in height."

Filing details

Case number (ASN)
2026-ASW-3153-NRA
Structure
General Construction Equipment 1
Type
Construction / other
Category
Construction equipment
Height above ground
15 ft
Height above sea level
1,304 ft
Site elevation
1,289 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
July 20, 2026
Determined
August 11, 2026
Determination expires
February 11, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
CITY OF Bentonville
Representative
GARVER

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
36.348189, -94.222017
Degrees / minutes / seconds
36°20'53.5"N 94°13'19.3"W
County
Benton

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.