Crane · 2026
3041 Skyway Cir N Irving TX
Irving, TX · near Dallas-Fort Worth Intl (3.4 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"Replacing AC equipment"
Filing details
- Case number (ASN)
- 2026-ASW-5677-OE
- Structure
- 3041 Skyway Cir N Irving TX
- Type
- Crane
- Category
- Crane
- Height above ground
- 150 ft
- Height above sea level
- 676 ft
- Site elevation
- 526 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- April 16, 2026
- Determined
- May 12, 2026
- Determination expires
- November 12, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DMCS Davis LLC DBA Davis Crane Group
- Representative
- DMCS Davis LLC DBA Davis Crane Group
Names are shown as they appear in the FAA's public record. How we handle names
See every 2026 filing by DMCS Davis LLC DBA Davis Crane Group →
Location
- Coordinates
- 32.874481, -96.986439
- Degrees / minutes / seconds
- 32°52'28.1"N 96°59'11.2"W
- County
- Dallas
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.