Pole lighting · 2026
B25-0614 AOA Gate 112 113 114 Construct.
DFW Airport, TX · near Dallas-Fort Worth Intl (1.9 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"B25-0614 AOA Gate 112 113 114 Construct.\nreplacing old Picture Perfect LMP and new rough-in for future Escort Verification Reader.\nAll data is transmitted on existing fiber. No new fiber installed.\nBefore construction the SIDA line will be relocated temporally during construction. All construction to take place on public side.\nBefore trenching contractor to call 811 FAA Fiber Locate Jet Fuel located ATMOS Gas locate and all other utilities.\nInfrastructure scope requires concrete saw cutting and removal on both sides of gate. Excavation in drive area and in grass. Bed trenches rough-in\nconduit and pedestal base platforms perform inspections backfill trenches take densities. Form and pour driveway place select fill in open grass\ntrench compact and take densities. Replant grass in grass area.\nAll trenching will be by hand excavation vacuum excavation when safe use a mini excavator. Pot holing by vacuum excavation only.\nSpoils removed daily.\nConduit to be placed under concrete and grass. Sch 80 conduit under paving Sch 40 with flow-fill concrete when under grass.\n(2) 1 ½” C (4) 1” C to be installed underground.\n(1) 1 ½” ” C to house (3) CAT 6A (2) OSDP (2) 2C#16 and (2) 6C#18 in each.\n(1) 1 ½” C to house (6) CAT 6A\n(1) 1” C to house (2) CAT 6A (2) OSDP and (2) 2C #16 continuous to security and network cabinet.\n(1) 1” C to house (1) 6C#18 to new ISC for Status Light Interface\n(2) 1”C with (3) #12 Conductors Each\n(1) 18x18x18 Inch Handhole\n(2) Dual Height Card Reader Pedestal\n(4) Bio Readers installed\n(1) ISC Lenel Onguard to replace LMP Picture Perfect. New ISC No. 889.\nUpon completion of this work FT1 FT2 testing with contractor. FT4 testing with TS / DPS will be performed.\nUpon owner acceptance SIDA will be restored to its original condition.\nTallest piece of equipment at any time during construction is 20’0”. This 20’ covers Badger Vacuum Excavator and or traditional mini excavator. .\nThis airspace study assumes a 25’ construction ceiling.\nNo equipment material spoils or trailers will be kept at the construction site overnight"
Filing details
- Case number (ASN)
- 2026-ASW-773-NRA
- Structure
- B25-0614 AOA Gate 112 113 114 Construct.
- Type
- Pole
- Category
- Pole lighting
- Height above ground
- 25 ft
- Height above sea level
- 623 ft
- Site elevation
- 598 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- February 11, 2026
- Determined
- April 8, 2026
- Determination expires
- October 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DFW International Airport
- Representative
- DFW International Airport
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 32.921547, -97.052444
- Degrees / minutes / seconds
- 32°55'17.6"N 97°03'08.8"W
- County
- Tarrant
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.