B25-0615 AOA Gate 111 Construction

DFW Airport, TX · near Dallas-Fort Worth Intl (1.4 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"B25-0615 AOA Gate 111 Construction\nScope of work includes installing a camera pole IT cabinet on pole and a Camera on the pole. Installing a 120V circuit from existing electrical cabinet to serve camera\nand Cellular Gateway. Owner will furnish and install Cellular Gateway.\nThis gate will have an Emergency Entrance System furnished by Owner.\nSecurity Data will be carried on cellular signal via Cellular Gateway\nBefore construction the SIDA line will be relocated temporally during construction. All construction to take place on public side.\nBefore trenching contractor to call 811 FAA Fiber Locate Jet Fuel located ATMOS Gas locate and all other utilities.\nInfrastructure scope requires concrete saw cutting and removal on secure side of gate. Excavation in drive area only. Bed trenches rough-in conduit to\ncamera pole base perform inspections backfill trenches take densities. Form and pour driveway. Construct a pier foundation for pole base. Install\nsecurity cabinet on pole. Install camera on pole. Owner to install wireless gate way inside pole.\nElectronic components such as cellular gateway or Ethernet switch shall be provided and installed by DFW ITS.\nAll trenching will be by hand excavation vacuum excavation when safe use a mini excavator. Pot holing by vacuum excavation only.\nSpoils removed daily.\n(1) 1” conduit serving camera pole security cabinet to provide 120V signal for camera and owner furnished Wireless Gateway.\nUpon completion of this work FT1 FT2 testing with contractor. FT4 testing with TS / DPS will be performed.\nSIDA fence will be returned to its permanent location.\nTallest piece of equipment at any time during construction is 20’0”. This 20’ covers Badger Vacuum Excavator and or traditional mini excavator. .\nThis airspace study assumes a 25’ construction ceiling.\nNo equipment material spoils or trailers will be kept at the construction site overnight."

Filing details

Case number (ASN)
2026-ASW-775-NRA
Structure
B25-0615 AOA Gate 111 Construction
Type
Pole
Category
Pole lighting
Height above ground
25 ft
Height above sea level
607 ft
Site elevation
582 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 11, 2026
Determined
April 8, 2026
Determination expires
October 8, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
DFW International Airport
Representative
DFW International Airport

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by DFW International Airport →

Location

Coordinates
32.916778, -97.046219
Degrees / minutes / seconds
32°55'00.4"N 97°02'46.4"W
County
Tarrant

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Dallas-Fort Worth Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.