Pole lighting · 2026
B25-0615 AOA Gate 111 Construction
DFW Airport, TX · near Dallas-Fort Worth Intl (1.4 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"B25-0615 AOA Gate 111 Construction\nScope of work includes installing a camera pole IT cabinet on pole and a Camera on the pole. Installing a 120V circuit from existing electrical cabinet to serve camera\nand Cellular Gateway. Owner will furnish and install Cellular Gateway.\nThis gate will have an Emergency Entrance System furnished by Owner.\nSecurity Data will be carried on cellular signal via Cellular Gateway\nBefore construction the SIDA line will be relocated temporally during construction. All construction to take place on public side.\nBefore trenching contractor to call 811 FAA Fiber Locate Jet Fuel located ATMOS Gas locate and all other utilities.\nInfrastructure scope requires concrete saw cutting and removal on secure side of gate. Excavation in drive area only. Bed trenches rough-in conduit to\ncamera pole base perform inspections backfill trenches take densities. Form and pour driveway. Construct a pier foundation for pole base. Install\nsecurity cabinet on pole. Install camera on pole. Owner to install wireless gate way inside pole.\nElectronic components such as cellular gateway or Ethernet switch shall be provided and installed by DFW ITS.\nAll trenching will be by hand excavation vacuum excavation when safe use a mini excavator. Pot holing by vacuum excavation only.\nSpoils removed daily.\n(1) 1” conduit serving camera pole security cabinet to provide 120V signal for camera and owner furnished Wireless Gateway.\nUpon completion of this work FT1 FT2 testing with contractor. FT4 testing with TS / DPS will be performed.\nSIDA fence will be returned to its permanent location.\nTallest piece of equipment at any time during construction is 20’0”. This 20’ covers Badger Vacuum Excavator and or traditional mini excavator. .\nThis airspace study assumes a 25’ construction ceiling.\nNo equipment material spoils or trailers will be kept at the construction site overnight."
Filing details
- Case number (ASN)
- 2026-ASW-775-NRA
- Structure
- B25-0615 AOA Gate 111 Construction
- Type
- Pole
- Category
- Pole lighting
- Height above ground
- 25 ft
- Height above sea level
- 607 ft
- Site elevation
- 582 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- February 11, 2026
- Determined
- April 8, 2026
- Determination expires
- October 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DFW International Airport
- Representative
- DFW International Airport
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 32.916778, -97.046219
- Degrees / minutes / seconds
- 32°55'00.4"N 97°02'46.4"W
- County
- Tarrant
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.