Pole lighting · 2026

B25-0619 AOA Gate 155 Construction

DFW Airport, TX · near Dallas-Fort Worth Intl (0.3 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"B25-0619 AOA Gate 155 Construction \nScope requires new conduit cabling dual height card readers and key pad secure exit side only. Proposed concrete pad and new ISC / IT cabinet A/C unit ISC panel \nfiber and copper connectivity UPS and cable management. Network switch to be provided by Owner.\nAOA fencing will be temporally relocated to allow for construction on both sides of the gate. Temporary fencing will remain throughout duration of construction. Gate\nwill be closed during construction. With the SIDA line temporally relocated all work will be performed on public side.\nInfrastructure scope requires concrete saw cutting and demolition on both sides of gate. Trenching for conduit drilling of camera pole pier foundation and bollards \nrough-in conduit inspections performed backfill trenches and take densities. Form and pour drive pole pier foundation and bollards. Camera pole placed on pier\nfoundation.\nConduit placed under concrete shall be Sch 80. Conduit placed under grass shall be Sch 40 with flow-fill concrete duct bank.\n(1) 1” Conduit for Fiber Connection\n(1) 1” Conduit serving new camera on pole\n(1) 1” Conduit serving new dual pedestal card readers / Key Pads\n(1) 1” Conduit serving ISC – 120V 20A 1P.\nInfrastructure scope requires the following:\nConstruction of (1) Concrete pier foundation 4500 PSI Strength\nConstruction of (1) Concrete equipment pad 4000 PSI Strength\nSetting of a camera pole. Max height of pole and all components equal 22.7 feet.\nHoffman 14 gauge type 316L cabinet on pole\nTAB to install Hanwha PNM-C16083RVQ camera\nDFW to perform FT4 Testing"

Filing details

Case number (ASN)
2026-ASW-787-NRA
Structure
B25-0619 AOA Gate 155 Construction
Type
Pole
Category
Pole lighting
Height above ground
25 ft
Height above sea level
605 ft
Site elevation
580 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 11, 2026
Determined
April 8, 2026
Determination expires
October 8, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
DFW International Airport
Representative
DFW International Airport

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by DFW International Airport →

Location

Coordinates
32.901050, -97.041467
Degrees / minutes / seconds
32°54'03.8"N 97°02'29.3"W
County
Tarrant

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Dallas-Fort Worth Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.