Construction equipment · 2026
Construction Equipment
McGehee, AR · near Mc Gehee Muni (0.1 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"For FY26 McGehee Municipal Airport intends to expand the existing apron. This project will be constructed in one phase with Runway 18-36 remaining open. The height of the equipment will not exceed 20'. The project is anticipated to last 60 calendar days and the four points included in this study fully encompass the project work area."
Filing details
- Case number (ASN)
- 2026-ASW-874-NRA
- Structure
- Construction Equipment
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 20 ft
- Height above sea level
- 159 ft
- Site elevation
- 139 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- February 20, 2026
- Determined
- April 23, 2026
- Determination expires
- October 23, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- McGehee Municipal Airport
- Representative
- McClelland Consulting Engineers, Inc.
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.620850, -91.364175
- Degrees / minutes / seconds
- 33°37'15.1"N 91°21'51.0"W
- County
- Desha
- Open in a map
- Google MapsOpenStreetMap
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.