Skip to content
LOS Analyzer

Antenna tower · 2026

OKOKC2057_FA-15525415 - ANT TWR/ NO C-BAND

Blair, OK · near Altus/Quartz Mountain Rgnl (6.8 mi)

Determination of no hazardDetermined - No Hazard329 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Requesting Lower Height (AGL). Installation of a new self support tower"

Filing details

Case number (ASN)
2026-ASW-924-OE
Structure
OKOKC2057_FA-15525415 - ANT TWR/ NO C-BAND
Type
Tower / antenna
Category
Antenna tower
Height above ground
329 ft
Height above sea level
1,793 ft
Site elevation
1,464 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
January 13, 2026
Determined
March 12, 2026
Determination expires
—

Who filed it

Sponsor
Tillman Infrastructure, LLC
Representative
Tillman Infrastructure, LLC

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Tillman Infrastructure, LLC →

Location

Coordinates
34.797972, -99.344431
Degrees / minutes / seconds
34°47'52.7"N 99°20'40.0"W
County
Jackson

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.