Skip to content
LOS Analyzer

Tank stack · 2026

HRSG Stack 2

Bristow, OK · near Jones Meml (1.7 mi)

No determination recordedPublic Comment199 ft AGL

What this outcome means

No determination is recorded on this case in the FAA's published archive. Cases still under study show no determination until the aeronautical study closes.

The proposal, in the filer's words

"Filing for proposed stacks for Natural Gas Combined Cycle NGCC natural gas plants These two new filings will replace the six previous filings 2026 ASW 2200 thru 2205 OE Site overview map uploaded to filing"

Filing details

Case number (ASN)
2026-ASW-9906-OE
Structure
HRSG Stack 2
Type
Stack
Category
Tank stack
Height above ground
199 ft
Height above sea level
1,077 ft
Site elevation
878 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 18, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
Tenaska Power Generation, LLC
Representative
Capitol Airspace Group

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
35.796175, -96.447769
Degrees / minutes / seconds
35°47'46.2"N 96°26'52.0"W
County
Creek

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.