Skip to content
LOS Analyzer

Crane · 2026

MRY Terminal Crane Operating Northern Area

Monterey, CA · near Monterey Rgnl (0.3 mi)

Returned to proponentDetermined - No Hazard90 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This is the operating area (maximum extent of the crane + boom operations) that will be temporarily operating on the north half of the new retaining wall to construct the Monterey Regional Airport New Terminal. (Please see MRY Terminal Development Cranes 20APR26.pdf for more information)"

Filing details

Case number (ASN)
2026-AWP-1056-NRA
Structure
MRY Terminal Crane Operating Northern Area
Type
Crane / mobile
Category
Crane
Height above ground
90 ft
Height above sea level
308 ft
Site elevation
218 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 20, 2026
Determined
April 29, 2026
Determination expires
October 29, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Monterey Regional Airport
Representative
Paul Hannah

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
36.585894, -121.847100
Degrees / minutes / seconds
36°35'09.2"N 121°50'49.6"W
County
Monterey

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Monterey Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.