Skip to content
LOS Analyzer

Crane · 2026

OMBAC Over The Line Event Fiesta Island

San DIego, CA · near San Diego Intl (3.5 mi)

Preliminary findingsPending95 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Resting permission to move in and set up a temporary stationary crane with boom tip maximum of 95' for local community event support."

Filing details

Case number (ASN)
2026-AWP-11199-OE
Structure
OMBAC Over The Line Event Fiesta Island
Type
Crane / fixed
Category
Crane
Height above ground
95 ft
Height above sea level
112 ft
Site elevation
17 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 28, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
Marco Crane & Rigging
Representative
Marco Crane & Rigging Co

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Marco Crane & Rigging →

Location

Coordinates
32.776584, -117.221322
Degrees / minutes / seconds
32°46'35.7"N 117°13'16.8"W
County
San Diego

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near San Diego Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.